Scheduled Maintenance Update from Servers Australia

  • Wednesday, 16th January, 2019
  • 05:14am
Details: During this maintenance window, Servers Australia Operational Staff will be conducting a Mains Fail Test (commonly known as a "Dark test") at our Syncom SYD1 facility. During this window, the mains power to site will be cut in a controlled manner and the site load transferred to generator for a 1 hour window to ensure that all systems continue to work as expected. At the end of this period, the site will be returned to mains power and conditions normalised. 
All plant equipment at this site has been fully serviced in December ahead of this test and there is no expected impact to your service. 

Affected Infrastructure:
Components:  Cloud Services, Colocation, Dedicated Servers, Infrastructure, Network
Locations:  Sydney - Syncom SYD1

Planned Start: 19/1/2019 8:00am (+1100)

Expected End: 19/1/2019 12:00pm (+1100)

Status Page: https://status.mysau.com.au

Manage subscription: https://status.mysau.com.au/pages/subscriber/manage/5a84da739589b51840c50ca1/5aa10ab3ee49d004e07df29a

For more information, please do not hesitate to contact us.
« Back